Friday, March 16, 2012

Dock Rebuild


Travis and I just spent a couple of days replacing the logs holding the dock up at the lake. Was a well timed adventure ad we were able to drive in to the camp yet still stand on the ice to work. Plus the lake level was down to winter level so logs normally underwater in summer were exposed.
Photos show step by step from the peel back of the top to tear down of logs. Then the build up with pressure treated and putting top back on with the replacement of a few top boards.
Rain held off the 2nd day til we were just finishing up top decking. Still probably a couple of weeks til the ice goes out of the lake. Usually around mid April.